Arena Rehabilitation Project
2025-RFPQ-01
Key Dates:
Closing Date: June 17th, 2025 at 10:00 AM
Question Period End Date: June 13th, 2025 at 12:00 PM
Documents:
2025-RFPQ-01 Tender Document available by using the following link:
2025-RFPQ-01 Arena Rehabilitation Project
Contact:
Dave McCarthy, Director of Operations
The Town of Deep River intends to rehabilitate the Deep River Arena in 2025 to modernize its ice rink infrastructure and enhance user experience. This project encompasses the design, engineering, and construction necessary to replace the existing refrigeration piping and headers, concrete slab, and dasher board system including glass, ensuring compliance with current standards and improving operational efficiency. The Arena is located at 2 Clubhouse Way, Deep River, ON.
Rehabilitation works are anticipated to include:
Submissions for the prequalification are being requested from contractors with expertise in the construction works summarized above. Each submission must include all of the information requested in this document. Only those contractors who successfully meet the requirements of the prequalification process will be invited to bid on this project.
The Town of Deep River is following a prequalification process (RFPQ) prior to tendering the above noted project. Submissions are being requested from GENERAL CONTRACTORS with expertise in the construction works summarized above. Each submission must include all of the information requested in this document. Only those General Contractors who successfully meet the requirements of the prequalification process will be invited to bid on this project